It sure is fun to see the three double hung windows emerging on the north elevation of the icehouse. And the three fixies above. And the three fixies on the south elevation. And the freshened up window aperture in the southeast corner, opposite the new bathroom in the small anteroom (once framing, well, and everything else, is complete.)
I’m talking about window apertures. And the transparency that all of the new windows (and doors) will bring to Rosslyn’s icehouse. The transformation will be dramatic!
With the north elevation becoming so porous, the team added plastic weatherproofing to ensure that an early December storm doesn’t punish us. In the photo below, you can see the in-between stage that probably should have appeared before the first and second photos above, the progression from opening up the sheathing for the three double hung windows and the three small fixies above.
This time of year we’re working on borrowed time, racing winter, keeping our fingers crossed that temperatures and moisture will remain within a favorable range. But, we’re also realistic. And practical. Better safe than sorry!
Keeping with my out-of-sequence chronology, I’ll double back again. This time to Matt putting some of the finishing touches on those upper windows. When everything is said and done, these three small window apertures will echo those in the carriage barn stables visible from the west and northwest, adding a handsome cohesion between the two buildings. And they will augment the transparency that is fundamental to this repurposing project. Just as the west wall is transforming from a solid first story and a small service opening on the second story (ostensibly to help pack in the ice?), to a window-filled, view-filled gable end, we’ve integrated a constellation of windows in the northwest section of the north elevation, dramatically shifting the transparency of the interior.
Again out of sequence, the photo above and the next one below offer some insight into the process. The team first framed in the window bucks from within the icehouse. Once everything was secure, they cut through the two layers of existing sheathing and the “air gap” which is filled with shredded newsprint insulation (all original to the icehouse) to open the apertures.
To the right of Justin (in the photo above) you can see the third double hung window and the three small windows (“fixies”) above framed and ready to have the sheathing cut out.
All six window frames have been cut out in this photo. Jarret, cutting framing material with the mitre saw, is bathed in natural light even though all six apertures are covered in semi-opaque plastic. Try, if your imagination is feeling nimble, to imagine those apertures a few months from now. The large, lower openings will receive six-over-six double hung windows that can be opened to allow a nice breeze to enter on the north side of the building. And the three small windows above are the non-operable square “fixies” that echo the stable windows in the carriage barn.
Although the drama today — at least in terms of apertures and fenestration — is found on the north elevation of the icehouse, there’s also some headway being made on the south elevation.
The new fenestration in the western portion (open area of icehouse with vaulted ceiling) repeats the high (clerestory) windows windows from the north façade, albeit with slightly different spacing. This southern exposure will introduce plenty of natural light to the principal space in the icehouse while editing the view of the carriage barn. Although these new apertures will not result in the same elevation transformation as the north side, they will significantly augment the natural light and the transparency.
Although windows will not be installed until spring, we have the ability in the short term (before exterior paneling is installed) to preview the inside-outside blurring — or would that be, outside-inside blurring?!?! — that we’re hoping to accomplish by introducing so many apertures into this small building.
And one more window is now ready for temporary paneling and spring installation of new casement. In the southeast corner of the building, directly to the left upon entering from the east, an existing window has been reframed and replaced with a matching but high efficiency Marvin window (that will be installed in duplicate on the north elevation, one in the same location as previously but now located in a bathroom, and another in the new mechanical room).
For those of you familiar with the building as it stood prior to this remodel, that aperture is unchanged.
Although the location (and window design) remains the same, Matt and Zack are fortifying the window buck to ensure exact location and structural integrity.
In my last icehouse rehab update I caught you up on the internal window framing. Now we’ve taken the full leap!
There are still two windows in the north elevation the need to be framed and open, and then there are all of the hight level windows in the two gable ends of the icehouse. This latter project will take place after first phase of insulation and subfloor installation (both scheduled for next week) so that staging can be set up to work so high up. Updates will be forthcoming…
In closing, a heap of gratitude to Pam, Hroth, Tony, Eric, Matt, Zack, Justin, and Jarret. Have a great weekend!
What do you think?