After many months of transformation Rosslyn’s icehouse rehab is approaching the finish line. The sum total is conceivable if not yet 100% visible. Many loose ends begging for attention, some small, some not so small. After some time away, adventuring, observing from afar, willing and coaxing and cajoling the project toward completion, I’m back. Boots on the ground. Evaluating the finish schedule and shuffling priorities and trying not to hyperventilate, focusing on the many miraculous accomplishments and essaying to stay calm about the still-to-do’s. Straddling the well-done’s and the still-to-do’s are the icehouse east and west decks. This evening I’ll catch up up on the decking, decking, decking!
You may remember that installation of the garapa decking was already completed on the east deck. In the photo above, you’re viewing the stairs up to the east entrance door. In the photograph below offers more of a 45° angle from southeast toward the northwest, capturing the entire east side deck.
You may recognize those two photographs from my previous post showcasing the completed east deck. Today’s news is that oiling and deck lighting have been completed.
In the photo above and below, you will note that the deck lighting still needs to be pushed in and secured. We will wait to do this until the oil has completely dried, approximately 2-3 days to be safe.
The oil definitely brings out the grain and color. This will fade as sun and weather interact with the oil sealed wood. By late summer, the deck will have mellowed to a more patinated tan or tannish gray. In late autumn we’ll apply another coat of oil this this and the other garapa decks to help preserve them during the long North Country winter.
West Deck Progress
The west deck of the icehouse is smaller than Rosslyn’s main house deck but considerably larger than the icehouse’s east deck. Although it does not have the challenge, posed by the stairs on the east side, it does accommodate a hot tub. That said, installation is moving swiftly afoot. The image above shows the structure ready for decking. And the image below, only a few days later, shows the better part of a third complete.
If you look closely, you’ll see that there are still plenty of garapa pegs that need to be installed in the skirt boards. That’s definitely time consuming. But what a spectacular result when complete!
As of today, less than a third of the decking remains to be installed, and the hot tub — still missing its permanent cover — is in situ, full of water, and *ALMOST* ready for a trial run!
In short, there are still plenty of projects to button up before the icehouse rehab is complete, but there’s also a lot to celebrate. And tonight we’re toasting the decking, decking, decking. Soon it will be done!