Last Friday I gushed that it’d been a monumental week. No hyperbole. Tackling (and completing) Rosslyn’s icehouse foundation was an epic accomplishment, a concrete collaboration conjoining two separate teams to rescue the foundering concrete project. And while Friday’s post was brief, timely-but-abbreviated recognition for the indefatigable individuals who pulled off this remarkable feat, today I’ll show you the step-by-step process from prep work and two separate concrete pours to completion of the icehouse foundation and crawlspace floor. I see this accomplishment as an enduring testament to (and foundation for, excuse the pun) the unique energy fueling Rosslyn’s icehouse rehab, an intrinsically collaborative and transformative revitalization and adaptive reuse project.
Rising from the Ashes
After repeatedly failing to produce a verifiable estimate, timeline, and definitive commitment (ie. a contract), the concrete subcontractor imploded mere days before starting work on the icehouse.
“Bad news,” Pam informed me and then told me she needed to get back to me in a moment. No time for bad news, I thought.
By the time she called me, minutes later, both in-house teams had convened to brainstorm. Given the tight project timeline, they decided to undertake the foundation and slab themselves. This marked a return to the original plan (subsequently discarded in lieu of hiring a concrete contractor in the mistaken assumption that it would streamline and accelerate the project timeline) but with a twist… turning two teams into one. Full pivot!
One team (Pam, Hroth, Tony, Justin, Eric, Matt, Andrew, Bob, Phil, Scott, Brandon, Ben, and others) has been rehab’ing the icehouse, and the other team (Pam, Peter, and Supi) has been rebuilding the boathouse gangway, etc. You read right, Pam is managing both projects. And several other Rosslyn initiatives including our master bedroom balcony re-decking, master bathroom shower tile tune-up, overall property management at Rosslyn, ADK Oasis Highlawn, ADK Oasis Lakeside, and multiple other properties. (Since I can hear you wondering, yes, she’s that good!)
The combined concrete collaboration would be Pam, Peter, Hroth, Supi, and Tony. With everyone coalescing around one specific goal — completing the icehouse concrete as well or better than a dedicated contractor without blowing up the budget or timeline — the objectives were obvious, but so was the potential for challenges and setbacks. Imagine a metaphorical pressure cooker. Top clamped tight. For a week. With zero room for mistakes. And yet, collaboration prevailed despite the inevitable stress.
From layout to excavation to vapor barrier to pinning the old foundation to setting rebar to wiring mesh to pouring initial footings and slab to forming curbs and setting rebar to final pour and stripping… these five came through delivered in a big way. Together they’ve guaranteed a sound, well constructed foundation for Rosslyn’s circa 1889 icehouse rehabilitation. I can report with profound pride and pleasure that it was a total success.
Most of the crew was able to gather on Saturday evening to celebrate their accomplishment, an end result that is in all likelihood superior to what we would’ve wound up with in the first place. Sometimes setbacks are actually the inspiration to regroup, reboot, and outperform original expectations. Sometimes fiasco fans the fires of triumph. Sometimes the phoenix rises from the ashes.
Video Mashup of Concrete Collaboration
If you’d prefer the quick zip through, then this video mashup is for you.
https://www.instagram.com/reel/CkovuO_AApb/
Thanks to Pam, Hroth, and Tony for recording the photos and videos featured in this video mashup!
Photo Essay of Concrete Collaboration
Okay, now it’s time for the photo essay chronicling the step-by-step progress and the series of accomplishments made possible by the collaboration of Pam, Peter, Hroth, Supi, and Tony.
Thanks to Pam, Hroth, and Tony for recording the photos featured in this photo essay
What do you think?